Project code: | BGMK0300051 |
Project call: | 2021TC16IPCB006 – 2023 – 3 |
Priority / Specific objective: | Priority 1 "Greener Border Region" RSO2.7 "Enhancing protection and preservation of nature, biodiversity and green infrastructure, including in urban areas, and reducing all forms of pollution" |
Type of project: | Investment |
Project duration in months: | 30 |
Project final contract amount: | EUR 867 653,84 |
Project EU co-financing rate: | EUR 737.505,74 |
Project start date: | 02.07.2024 |
Project end date: | 01.01.2027 |
Partners: | LP: Municipality of Gotse Delchev PP2: Municipality of Stip PP3: Centre for development of the East planning region |
Project summary: | EcoScape project’s overall objective is to promote and facilitate the adoption of environmentally friendly solutions within urban areas across the cross-border region establishing an environment conducive to increased greenery in urban and peri-urban zones within the cross-border region and facilitate the transition towards sustainable practices The benefits of the project for the cross-border region can be defined in the following important aspects: 1. Raising public awareness of the green infrastructure and green transition topic; 2. Develop skills and knowledge of the representatives of the municipalities, regional authorities, public municipal enterprises, and other stakeholders in the field of green infrastructure and green transition; 3. Climate change resilience; 4. Preparation of the municipalities and other stakeholders for future green infrastructure and green transition-related challenges; 5. Improvement of quality of air and quality of life in the tackled cities on both sides of the border. Project investment activities in Municipality of Gotse Delchev include: Construction of green infrastructure on three public properties an area of 0,775 ha, new greenery (low and high) consisting of tall deciduous trees, decorated with flower arrangements and low-stemmed ornamental plants, one pocket park, solar lighting; Improvement and reconstruction of the green areas - it is planned that the existing species composition of the green vegetation will be species tolerant of pollution of the air and high urban temperatures; Replacement of the existing pavements with new permeable natural materials - a permeable pavement made of granite paving and parking elements of a grass joint; Replacement of the lighting with energy-saving lighting. The location of the investment is Gotse Delchev, Green spaces (parks) situated around of the House of Culture. Project investment activities in Municipality of Shtip include: Improvement of 3 sites - "8th of November" park, "Joben Park" and "Medicinski" park in the city of Shtip - transformation of urban spaces with green infrastructure, landscaping and a hydro system for the green areas; installation of urban furniture. It is planned to plant new greenery (low and high), consisting of tall deciduous trees, decorated with flower arrangements and low-stemmed decorative evergreen plants. Total area covered is 1,135 ha in the central city area. Apart from introducing green infrastructure to the region main outputs of the project will be:
Result indicators: RCR95 Population having access to new or improved green infrastructure - 60 047 persons RCR104 Solutions taken up or up-scaled by organisations - 1,00 solution
Program output indicator: RCO36 Green infrastructure supported for other purposes than adaptation to climate change: 1,91 ha |